This is a heavily interactive web application, and JavaScript is required. Simple HTML interfaces are possible, but that is not what this is.
Post
daveapong.bsky.social
did:plc:bruozsprbvv2r4mc2sfc3eax
The Phase 2 plan already has it turning left at 125th St for a connection at the MNR station so it makes more sense to have it keep going for a 125th St crosstown line.
2025-08-15T19:02:07.810Z