This 2023 report includes a Southland electrical network diagram. It shows a third 220kv line leaving North Makerewa substation, but that goes east, a few km north of the Datagrid site. It also shows upgrades planned elsewhere in Southland, but not near the site.
https://www.eeca.govt.nz/assets/EECA-Resources/Co-funding/RETA-Southland-Electrical-Network-Spare-Capacity-and-Load-Characteristics.pdf