This is a heavily interactive web application, and JavaScript is required. Simple HTML interfaces are possible, but that is not what this is.
Post
The Narwhal
thenarwhalca.bsky.social
did:plc:sxywaaocdrjp7aywbhsqpjn7
“I was impressed with the Minister and it looks like he is a person of action so we should expect decisions to be made,” wrote the board chair of the Alberta Electricity System Operator in an internal email obtained by @drewanderson.bsky.social
https://thenarwhal.ca/alberta-renewables-pause-contradictions/
2024-05-15T15:13:35.499Z