This is a heavily interactive web application, and JavaScript is required. Simple HTML interfaces are possible, but that is not what this is.
Post
Jarrett Walker
humantransit.bsky.social
did:plc:foqqylmh2uunzk5te4cxzpow
Toronto's expanding rail network looks nice on map but the disconnect between Lines 4 and 6 is a real problem, and it will get works if 6t ever starts running faster than the bus it replaced.
I warned them about this years ago.
Grid cities need grid transit networks.
[contains quote post or other embedded content]
2026-02-07T20:18:33.949Z