This is a heavily interactive web application, and JavaScript is required. Simple HTML interfaces are possible, but that is not what this is.
Post
Kevin Schwarzwald
kschwarzwald.bsky.social
did:plc:lccmef5tshieef3qhdo2jgdu
The extra capacity on the intercities is very needed - despite 2+ tph by the federal railways and 1-2 tph by the private operator WESTbahn, trains, especially on Fri / Sun, are often completely packed, many standees.
+ the EMUs should speed up the all-stop service over the current loco-hauled one!
2025-06-25T13:17:31.842Z