This is a heavily interactive web application, and JavaScript is required. Simple HTML interfaces are possible, but that is not what this is.
Post
Michael Smith
mesmith35673.bsky.social
did:plc:aocys3wrwzpox76xoy6bkpcu
I am glad to see that a “paved asphalt walkway” on 43rd is included in Phase 3. 43rd Ave is nearly 40ft wide and has zero pedestrian or bike infrastructure.
2026-05-11T22:57:27.574Z