This is a heavily interactive web application, and JavaScript is required. Simple HTML interfaces are possible, but that is not what this is.
Post
numble.bsky.social
did:plc:a42jqwjlcksjan3aolgsyyo5
June 2024 LA Metro update to FTA on B/D service plans.
Updated plan: 10 min headways with 4 car trains on B/D Lines starting 12/2024, using 8 new HR4000 cars. When D Line extensions open with 5 min headways, B Line stays at 10 min headways and 4 cars (instead of 15 min, 6 cars).
[contains quote post or other embedded content]
2024-07-17T01:12:08.893Z