This is a heavily interactive web application, and JavaScript is required. Simple HTML interfaces are possible, but that is not what this is.
Post
numble.bsky.social
did:plc:a42jqwjlcksjan3aolgsyyo5
November 2024 status report for LA Metro’s D Line Extension Section 3. 57.1% as of 11/29/24, +0.5% since 10/26/24.
https://libraryarchives.metro.net/DPGTL/StatusReports/2024-11-westside-purple-line-extension-section-3.pdf
[contains quote post or other embedded content]
2025-03-28T09:34:05.911Z