This is a heavily interactive web application, and JavaScript is required. Simple HTML interfaces are possible, but that is not what this is.
Post
The Tech Capital
thetechcapital.com
did:plc:jfgtrrsrzmdatednj3yzj2u5
OpenAI has announced plans for a 3.2GW data centre project in Effingham County, Georgia, with power scheduled to be delivered in phases between 2028 and 2032.
Full story: https://thetechcapital.com/openai-plans-3-2gw-georgia-campus-amid-us-data-centre-pushback/
Signal over noise.
#thetechcapital
2026-07-24T12:15:39.776Z